[1]
Mayrazaka, A.I., Priantana, R.D. and Sayuthi, S. 2024. Analysis of Determination of Production Costs and Full Cost Recovery (a Case Study at PDAM XYZ Banda Aceh City). Formosa Journal of Applied Sciences. 3, 1 (Feb. 2024), 311–328. DOI:https://doi.org/10.55927/fjas.v3i1.7636.