(1)
Mayrazaka, A. I.; Priantana, R. D.; Sayuthi, S. Analysis of Determination of Production Costs and Full Cost Recovery (a Case Study at PDAM XYZ Banda Aceh City). FJAS 2024, 3, 311-328.