Mayrazaka, A. I., Priantana, R. D., & Sayuthi, S. (2024). Analysis of Determination of Production Costs and Full Cost Recovery (a Case Study at PDAM XYZ Banda Aceh City). Formosa Journal of Applied Sciences, 3(1), 311–328. https://doi.org/10.55927/fjas.v3i1.7636