[1]
A. I. Mayrazaka, R. D. Priantana, and S. Sayuthi, “Analysis of Determination of Production Costs and Full Cost Recovery (a Case Study at PDAM XYZ Banda Aceh City)”, FJAS, vol. 3, no. 1, pp. 311–328, Feb. 2024.