[1]
Aprilia Regita Tri Cahyani and I Nyoman Dita Pahang Putra 2024. Material Planning for Upper Structure Work Based on the Material Requirement Planning (MRP) Method in the Kasih Ibu Hospital Construction Project, Surakarta. Formosa Journal of Multidisciplinary Research. 3, 5 (May 2024), 1467–1480. DOI:https://doi.org/10.55927/fjmr.v3i5.9525.