Design of Traffic Lights at the Unsignalized Intersection of Narogong Highway-Pangkalan 5 Road Km. 13.5 Bekasi City, West Java

Authors

  • Aulia Choiri Universitas Global Jakarta
  • Ribut Nawang Sari Universitas Global Jakarta
  • Dinar Ali Universitas Global Jakarta
  • Lintang D.A Universitas Global Jakarta
  • Yunan Hanun Universitas Global Jakarta

DOI:

https://doi.org/10.55927/mudima.v3i9.4781

Keywords:

Intersection Performance, Traffic Lights, Planning, MKJI

Abstract

The intersection of Narogong Highway-Pangkalan road 5, Bantargebang , Bekasi city, is a four-arm intersection that connects Bekasi City with Bogor Regency and is the access to the Bantargebang TPA. The irregular and narrow traffic conditions at the intersection cause frequent traffic jams and are prone to accidents. Therefore, it is necessary to analyze the need for traffic light at the intersection so that a solution can be found in overcoming the problem of congestion and can help smooth the intersection. This analysis is based on the MKJI method (Indonesian Road Capacity Manual) 1997. The results of the analysis show that the intersection of Narogong Highway - Pangkalan road 5, Bekasi City is not able to serve the traffic flow to the maximum, this can be shown by the result of the calculation that has been carried out, so an analysis is needed to improve the performance of the intersection, from the existing calculations alternatives, selected 3 phase alternative with geometric widening, from this solution a cycle time of 80 seconds was obtained with a degree of saturation (DS) = 0.690 to 0.839, and a maximum queue length of 104 meters. The intersection of Jalan Raya Narogong - Jalan Pangkalan 5, Bantargebang , Bekasi City, is intersection four the arm that connects Bekasi City with regency Bogor as well as is access going to to Bantargebang landfill . Condition Then cross that doesn't regular and narrow at intersections the cause often happen congestion and danger happen accident . Therefore _ that is necessary Analysis Need for Traffic Lights at intersections so that obtained solution in overcome problem traffic jams and can help smoothness at intersections . Analysis This based on MKJI method ( Indonesian Road Capacity Manual) 1997. Analysis results is known that , the intersection of Jalan Raya Narogong - Jalan Pangkalan 5 Bekasi City is not capable serve current Then cross with maximum , p This can showed with results calculations that have been made done , so required analysis For increase performance intersection , from alternative existing calculations , selected _ 3 phase alternative with widening geometric , from solution This obtained time cycle by 80 seconds with mark degrees saturation (DS) = 0.690 to 0.839, and long queue maximum 104 meters

References

Anggraini, M., Irawan, E., & Winayati, W. (2021). Planning for Traffic Light Simpang Empat Jl. Hr Soebrantas Panam – Jl. Raya Pekanbaru – Jl. Kubang Raya – Jl. Garuda Sakti Pekanbaru City. Racic : Wed Construction Research , 6 (1), 12–21. https://doi.org/10.36341/racic.v6i1.1415

Anggraini, RA, Sinaga, YE, Lestari, F., Pramita, G., & Kastamto, K. (2022). Evaluation of unsignalized intersections and fire planning. JICE (Journal of Infrastructural in Civil Engineering) , 3 (02), 32. https://doi.org/10.33365/jice.v3i02.2152

Azima, F., & Yermadona, H. (2022). Analysis of the Performance of the Unsignalized Interchange at the Tanjung Pati Intersection, District 50, City. Encyclopedia Research and Community Service Review , 1 (2), 53–58. http://jurnal.ensiklopediaku.org

Budiman, A., & Intari, DE (2016). Performance analysis of signalized intersections at the Boru intersection in Serang City. Foundation : Journal of Civil Engineering , 5 (2), 1–11. https://doi.org/10.36055/jft.v5i2.1252

Directorate General of Highways. (1997). Mkji 1997. In department of public works, “Indonesian Road Capacity Manual” (pp. 1–573).

Hasbi. (2019). Traffic Light Planning Study at the Ambe Nona-Opu to Sappaile-Batara Road Intersection, Palopo City . 16 , 1–17.

Hasibuan, DYFC, & Muchammad Zaenal Muttaqin. (2021). Performance Analysis of Non-Signalized Intersections at Sibuhuan Market Intersection, Padang Lawas Regency, North Sumatra. Scientific Journal , 21 (01), 53–60. https://doi.org/10.25299/saintis.2021.vol21(01).6507

Hutabarat, S., Lubis, F., & Saleh, A. (2020). Traffic Light Planning at the intersection of Jalan Garuda Sakti - Jalan Melati - Jalan Binawidya, Pekanbaru City. Engineering Journal , 14 (2), 193–202. https://doi.org/10.31849/teknik.v14i2.4949

Kartika, SW, Syafaruddin, & Sumiyattinah. (2016). Analysis and Evaluation of Roundabout Performance at SMP Negeri 1 Pontianak. Tanjungpura University Civil Engineering Student Journal , 1 (1), 1–10.

Kumalawati, A., Sir, TMW, & Woda, D. (2022). Performance of signalized intersections at four intersections in Ende City. Journal of Civil Engineering , 11 (1), 41–48.

Kurniati, T., Latif, A., & Putri, EE (2020). Evaluation and Planning of Traffic Lights at the Syekh Umar Khalil Road Intersection-Bypass Padang City. Civil Engineering Journal (JRS-Unand) , 16 (1), 49. https://doi.org/10.25077/jrs.16.1.49-64.2020

Listiana, N., & Sudibyo, T. (2019). Performance Analysis of Unsignalized Intersections on Jalan Raya Dramaga-Bubulak Bogor, West Java. Journal of Civil and Environmental Engineering , 4 (1), 69–78. https://doi.org/10.29244/jsil.4.1.69-78

Los, UMDECDE (nd). ANALYSIS STUDY OF TRAFFIC LIGHT NEEDS AT THE UNSIGNALED TRIANGLE INTERCEPTION JL IR. SOEKARNO – DRS. MOH. HATTA, PENDEM, BATU, MALANG. Arranged .

Prakoso, DB, Sutoyo, S., & Sudibyo, T. (2019). Evaluation of the Performance of the Jalan Pahlawan – Raden Saleh Sarif Bustaman signalized intersection in Bogor, West Java. Journal of Civil and Environmental Engineering , 4 (2), 135–148. https://doi.org/10.29244/jsil.4.2.135-148

Safri, A., Das, AM, & Dony, W. (2021). Evaluation of the signalized intersection of Jalan Police Colonel M Taher, Jambi City. Civil Talent Journal , 4 (2), 94. https://doi.org/10.33087/talentasipil.v4i2.54

Sriharyani, L., & Hadijah, I. (2016). Performance analysis of non-signalized intersections in Metro City (case study of road intersections, Jalan Jend. Sudirman, Jalan Sumbawa, Jalan Wijaya Kusuma and inspection roads). FOOTPRINT : Construction Application Technology , 6 (1), 8–14.

StudyAnalysis of Vehicle Volume at Signalized Intersections at the Alun Alun Intersection in Kediri City . (nd).

Wibisono, E. (2019). Performance Analysis of Signalized Intersections at Simpang Papar for Planning the Kertosono-Kediri Toll Road. UKaRsT , 3 (2), 23. https://doi.org/10.30737/ukarst.v3i2.492

Wirianata, AD, AS, S., & Sumiyattinah. (2020). Traffic Light Planning at the intersection of Jalan Jenderal Urip Sumoharjo-Jalan Hos Cokroaminoto-Jalan Johar-Jalan Merdeka, Pontianak City . 1–10.

Yayang Nurkafi, A., Cahyo, Y., Winarto, S., & Candra, AI (2019). Performance Analysis of Unsignalized Intersections at Branggahan Ngadiluwih Interchange, Kediri Regency. Journal of Technology Management & Civil Engineering , 2 (1), 164. https://doi.org/10.30737/jurmateks.v2i1.408

Downloads

Published

2023-09-29

How to Cite

Aulia Choiri, Ribut Nawang Sari, Dinar Ali, Lintang D.A, & Yunan Hanun. (2023). Design of Traffic Lights at the Unsignalized Intersection of Narogong Highway-Pangkalan 5 Road Km. 13.5 Bekasi City, West Java. Jurnal Multidisiplin Madani, 3(9), 2011–2025. https://doi.org/10.55927/mudima.v3i9.4781