Improving Efficiency in Construction Projects through Utilization of BIM Technology in Construction Project Management
DOI:
https://doi.org/10.55927/fjas.v3i10.11439Keywords:
Construction Project Management, BIM Technology, Construction Project EfficiencyAbstract
The research method uses a quantitative approach with a population of construction companies that have implemented BIM, and the sample consists of staff and project managers selected by purposive sampling of 100 respondents. The data used is primary and secondary data with data collection techniques via online questionnaires which are analyzed using Pearson correlation analysis and multiple linear regression. The research results show that BIM adoption and supporting factors such as training, infrastructure, and management support have a significant effect on project efficiency, so these findings support broader BIM implementation and improving supporting factors as a strategy to increase efficiency in construction projects. Therefore, it is recommended that construction companies increase investment in BIM technology as well as training and infrastructure support to maximize project efficiency benefits.
Downloads
References
Alam, F., Ali, J., Madni, S., & Husnain, H. A. (2023). Identifying Barriers to Effective BIM Adoption in the Re-Engineering of Construction Business Practices in Developing Countries. Preprints. https://doi.org/10.20944/preprints202305.1378.v1
Alsuliman, J.A. (2019). Causes of delay in Saudi public construction projects. Alexandria Engineering Journal, 58(2), 801-808. https://doi.org/10.1016/j.aej.2019.07.002.
Benmicia, N., & Belarbi, L. (2024). Bim: A Collaborative Approach To Architectural Project Management. International Journal of Innovative Technologies in Social Science, 2(42). https://doi.org/10.31435/rsglobal_ijitss/30062024/8136
BPS. (18 Mei 2023). Indikator Konstruksi, Triwulanan IV-2022. Badan Pusat Statistik, URL https://www.bps.go.id/id/publication/2023/05/18/0a18d6dd017b1005c31ea834/indikator-konstruksi--triwulanan-iv-2022.html
Dmitrieva T.L., Yashchenko V.P., & Kuryshov I.A. (2023). BIM as a means of end-to-end design, construction and operation technologies. News of universities. Investments. Construction. Real estate, 13 (2): 252-261. https://doi.org/10.21285/2227-2917-2023-2-252-261
Fitra, S., Negara , K. P. ., & Wijatmiko , I. . (2024). Improving Knowledge Management Process Using Bim In Indonesian State-Owned Construction Enterprises. Applied Research on Civil Engineering and Environment (ARCEE), 5(01), 1–13. https://doi.org/10.32722/arcee.v5i01.5774
Kennedy, G. W., Sunday, S. E., Pandey, D., Kabari, A. D., Pandey, B. K., George, A. S., & Dadheech, P. (2024). Building Information Modeling: Harnessing Innovations for Professional Proficiency. In Y. El Kacimi & K. Alaoui (Eds.), Emerging Engineering Technologies and Industrial Applications (pp. 305-331). IGI Global. https://doi.org/10.4018/979-8-3693-1335-0.ch015.
Kopac, L., Pelz, S., & Gheorghe, M. (2022). Construction Management In Practice. International Association for Development of the Information Society, 127-131. doi: https://doi.org/10.33965/ice2022_202210l016
Maharani, A.S.A., & Alexander, H.B. (09 Februari 2024). 5 PSN Tol Beres Tahun 2023, Habiskan Rp 28,02 Triliun Duit Negara. Kompas.com, URL https://www.kompas.com/properti/read/2024/02/09/080000721/5-psn-tol-beres-tahun-2023-habiskan-rp-28-02-triliun-duit-negara
Paul, M. (15 Juni 2023). Saas For Construction Technology: A Key Step In Digital Transformation. InEight, URL https://ineight.com/blog/saas-for-construction-technology-a-key-step-in-digital-transformation/
Rachman, A. (5 Februari 2024). Konstruksi Tumbuh Melesat di 2023, Tapi Real Estate Kok Loyo?, CNBC Indonesia, URL https://www.cnbcindonesia.com/news/20240205135501-4-511962/konstruksi-tumbuh-melesat-di-2023-tapi-real-estate-kok-loyo
Regona, M., Yigitcanlar, T., Xia, B., & Li, R.Y.M. (2022). Opportunities and Adoption Challenges of AI in the Construction Industry: A PRISMA Review. Journal of Open Innovation: Technology, Market, and Complexity, 8(1). https://doi.org/10.3390/joitmc8010045.
Sakhare, V.D., & Dixit, A.S. (2024). Enhanced Construction Productivity by Effective Equipment Management through Fleet Operations. International Journal for Research in Applied Science & Engineering Technology (IJRASET), 12(5). https://doi.org/10.22214/ijraset.2024.61889
Sapitri, M., & Safriani, M. (2023). Analisis Perbedaan Item Pekerjaan dan Volume Dengan Realisasi Lapangan di Pembangunan Lanjutan Gedung Kejari Tapaktuan. Jurnal Penelitian dan Pengabdian Masyarakat, 2(10). https://doi.org/10.59141/comserva.v2i10.598
Senghani, H.D., Bhavsar, A.N., Pitroda, J.R., & Patel, A.D.H. (2023). Project’s Success Factor in the Building Construction: A State of Art Review. International Journal of Scientific Research in Engineering and Management (IJSREM), 7(3). DOI: 10.55041/IJSREM18138
Shrividya, S., & Sindhu, V.U. (2023). A Review on Adoption of Bim in Reducing Construction Rework. International Journal of Advanced Research in Science, Communication and Technology (IJARSCT), 3(3). DOI: 10.48175/IJARSCT-14378
Soto, C. (10 May 2024). Construction Technology: 16 Building Technologies Driving the Future. Digital Asset Management (DAM) Management, URL https://openasset.com/blog/construction-technology/
Szafranko, E., & Jurczak, M. (2024). Implementability of BIM Technology in Light of Literature Studies and Analyses of the Construction Market. Sustainability, 16(3), 1083. https://doi.org/10.3390/su16031083
Umaapathy, S. V., & Sundarrajan, S. (2023). BIM Adoption for effective interface management in Indian construction industries, GRAĐEVINAR, 75 (3), 211-223, doi: https://doi.org/10.14256/JCE.3559.2022
Utama, S. F., Negara, K. P., & Wijatmiko, I. (2023). BIM Implementation for Storing, Sharing and Capturing Knowledge in Indonesian Project Construction. Civil and Environmental Science Journal (CIVENSE), 6(2), 163–173. https://doi.org/10.21776/civense.v6i2.414
Vigneshwar, R.V.K., & Shanmugapriya, S. (2022). Potential management factors influencing construction projects, GRAĐEVINAR, 74(12), 1037-1046, doi: https://doi.org/10.14256/JCE.3563.2022
Widiasanti, I., Wijaya, M.A., Anggraini, S., Balqis, O.A., Suryapratama, R.Y., & Prasetya, B.T. (2023). Penerapan Building Information Modeling (Bim) 5D pada Manajemen Biaya Proyek dalam Dunia Konstruksi. Jurnal Talenta Sipil, 6(2), 256-260. http://dx.doi.org/10.33087/talentasipil.v6i2.299
Yahya, M.R., & Hatem, W.A. (2023). Building Information Modelling (BIM) Applications in the Construction Sector to Improve Project Planning Facilities . Diyala Journal of Engineering Sciences, 16(3), 124–133. https://doi.org/10.24237/djes.2023.16310
Zahedi, F., Dang, Hongtao., Sardroud, J.M., & Shirzadi, M. (2024). BIM Implementation for PMBOK Enhancement in the Construction Industry. EPiC Series in Built Environment, 5, 695-703. https://doi.org/10.29007/k7nf
Zhang, M. (2023). Research on construction management in construction project management. Industrial Engineering and Innovation Management, 6(4), 53-58. DOI: http://dx.doi.org/10.23977/ieim.2023.060408.
Zigurat. (20 Maret 2024). The Unique Benefits of Building Information Modeling (BIM). Zigurat Institute of Technology, URL https://www.e-zigurat.com/en/blog/benefits-of-bim/
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Lindawati Unbara

This work is licensed under a Creative Commons Attribution 4.0 International License.






















