Investing in Renewable Energy: Decarbonizing Power Plant Industry with the Feasibility Study of Mini-Hydro Project

Authors

  • Eko Tama Putra Saratian Universitas Mercu Buana

DOI:

https://doi.org/10.55927/fjas.v2i7.5315

Keywords:

Feasibility Study, Mini-Hydro, Power Plant, Renewable Energy

Abstract

This study aims to analyze and determine the feasibility study of a mini-hydro project with a capacity of 2 x 3 MW in West Java, Indonesia. This research is a qualitative research with a case study approach. The selection of participants in this study used a purposive sampling technique, where the data collected was obtained from primary and secondary data. The data analysis used in this research is cash flow projection evaluation by calculating Payback-Period (PBP), Net Present Value (NPV) and Internal Rate of Return (IRR). Based on the calculations that have been made, the investment feasibility indicators for the projects to be funded are the Payback Period of 8 years and 3 months, the NPV of IDR 3,977 million and the IRR of 11.22% so that the mini-hydro project is said to be feasible to run.

Downloads

Download data is not yet available.

References

Amin, N., Song, H., & Shabbir, M.S. (2022). What factors contribute to environmental degradation in G11 economies? Emphasizing the importance of renewable and non-renewable energy sources. International Journal of Sustainable Development & World Ecology, 29, 472 - 482.

Badan Pusat Statistik. (2022). Persentase Rumah tangga dengan Sumber Penerangan Listrik PLN (Persen), 2020-2022.

https://www.bps.go.id/indicator/29/87/1/persentase-rumah-tangga-dengan-sumber-penerangan-listrik-pln.html. Diakses 5 Juli 2023

Cheremushkin, S.V. (2016). Generalized Method of Determining the Payback Period for both Conventional and Non-conventional Cash Flows: Ready-to-Use Excel Formulas and UDF. Financial Engineering eJournal.

Dai, H., Li, N., Wang, Y., & Zhao, X. (2022). The Analysis of Three Main Investment Criteria: NPV IRR and Payback Period. Proceedings of the 2022 7th International Conference on Financial Innovation and Economic Development (ICFIED 2022).

Eales, A., Archer, L., Buckland, H.M., Frame, D.F., & Galloway, S.J. (2018). Feasibility Study for a Solar PV Microgrid in Malawi. 2018 53rd International Universities Power Engineering Conference (UPEC), 1-6.

Felice, A., Rakocevic, L., Peeters, L., Messagie, M., Coosemans, T., & Camargo, L.R. (2021). An assessment of operational economic benefits of renewable energy communities in Belgium. Journal of Physics: Conference Series, 2042.

Ferdinand, A. (2014). Metode Penelitian Manajemen. Badan Penerbit Universitas Diponegoro, Semarang.

Gaspars-Wieloch, H. (2019). Project Net Present Value estimation under uncertainty. Central European Journal of Operations Research, 27, 179-197.

HamdAllh, H.H., Moharram, M.R., Yssin, M.A., Gouda, M., & Embaby, A. (2020). Effect of Cutoff Grade and Stripping Ratio on the Net Present Value for Hamama Gold Project, Eastern Desert, Egypt.

Hašková, S., Kučera, J., & Kuchár, R. (2022). Fuzzy Payback Period of Investment into Modernization of Production Network. ACC Journal.

He, G., Liu, K., Wang, S., Lei, Y., & Li, J. (2022). CWM-CGAN Method for Renewable Energy Scenario Generation Based on Weather Label Multi-Factor Definition. Processes.

Imaningsih, E. S., Nawangsari, L. C., Saratian, E. T. P., Wibowo M. W. (2022). Green Management. Media Edu Pustaka, Jakarta.

Kim, B., Shim, E., & Reinschmidt, K.F. (2013). Probability Distribution of the Project Payback Period Using the Equivalent Cash Flow Decomposition. The Engineering Economist, 58, 112 - 136.

Kotsyuba, O.S. (2020). Estimating the Payback Period of an Investment Project in the Framework of a Fuzzy Set Statement of the Problem. Business Inform, 10, 173-179.

Loginovskiy, O., & Ya.D., G. (2016). Use of an investment payback period in Order to Analyze project effectiveness. Bulletin of the South Ural State University. Ser. Computer Technologies, Automatic Control & Radioelectronics, 16, 132-135.

Marks-Bielska, R., Bielski, S., Pik, K., & Kurowska, K. (2020). The Importance of Renewable Energy Sources in Poland’s Energy Mix. Energies, 13, 4624.

Mingxia, L. (2015). Study on the Application of Investment Payback Period Index in BOT Construction Project. Advanced Materials Research.

Pangarso, S.S., Aminata, J., & Utama, N.A. (2022). Technical Due Diligence for Minihydro Power Plant Project in Indonesia. IOP Conference Series: Earth and Environmental Science, 997.

Rahardjo, M. (2017). Studi Kasus dalam Penelitian Kualitatif: Konsep dan Prosedurnya. Universitas Islam Negeri Maulana Malik Ibrahim, Malang.

Sabishchenko, O. (2021). MANAGING THE ECONOMIC BENEFITS OF HYBRID RENEWABLE ENERGY SYSTEMS IN UKRAINE. EDUCATION AND SCIENCE OF TODAY: INTERSECTORAL ISSUES AND DEVELOPMENT OF SCIENCES VOLUME1.

Saratian, E. T. P., Afri, O., Simamora, E. P., & Susilowati, T. (2022). Exploring Factors in Improving Funding Sales Team Performance: Case Study from Overseas Bank. International Journal of Scientific Engineering and Science. 6(8), 63-68

Sarwono, J. (2013). Strategi Melakukan Riset. Graha Ilmu. Yogyakarta.

Yousif, M.A. (2020). Renewable Energy Challenges and Opportunities in the Kingdom of Saudi Arabia. International Journal of Economics and Finance.

Zavody, Z. (2014). The grid challenges for renewable energy — An overview and some priorities.

Downloads

Published

2023-07-29

How to Cite

Saratian, E. T. P. (2023). Investing in Renewable Energy: Decarbonizing Power Plant Industry with the Feasibility Study of Mini-Hydro Project. Formosa Journal of Applied Sciences, 2(7), 1729–1742. https://doi.org/10.55927/fjas.v2i7.5315

Issue

Section

Articles