Analysis of Parking Needs at Sakura Mart Amurang

Authors

  • Josep Sumajouw Department of Civil Engineering, Manado State Polytechnic
  • Don Kabo Department of Civil Engineering, Manado State Polytechnic
  • Seska Nicolaas Department of Civil Engineering, Manado State Polytechnic

DOI:

https://doi.org/10.55927/fjsr.v3i4.8880

Keywords:

Analysis for the Need of Parking Space, Vehicle Waiting Time, Parking Space Unit

Abstract

Sakura Mart is the largest shopping center in Amurang City, North Sulawesi, Indonesia. At Sakura Mart Amurang the parking facilities cannot accommodate parking needs. This analytical research aims to calculate the parking space requirements that must be provided for visitors when in the Sakura Mart Amurang parking area. The steps taken include calculating parking volume, parking accumulation, parking duration, parking capacity, parking availability, parking index, parking turnover rate, analysis of parking space requirements, and vehicle waiting time. The total shortage of parking space for two-wheeled vehicles is 92 spaces, while for four-wheeled vehicles 23 spaces must be provided with a total area of 516 m². For the time being, to reduce existing parking capacity, a maximum vehicle waiting time of 11 minutes 30.6 seconds for two-wheeled vehicles and 19 minutes 0.015 seconds for four-wheeled vehicles is used. Waiting time limits in parking areas must be emphasized so that they can accommodate all vehicles that come to park their vehicles, then by providing rates and multiples of rates after the specified waiting time has passed, it can encourage vehicle owners not to linger in the parking lot. area. parking area. parking area. The arrangement of the parking area must be considered with a good and correct parking management system for the convenience of parking users at Sakura Mart Amurang

Downloads

Download data is not yet available.

References

Abrori, M. A., Lubis, M., & Tarigan, G. (2024). Analisis Kebutuhan Ruang Parkir Pada Pusat Perbelanjaan Yang Ada Di Kecamatan Medan Denai ( Studi Kasus Balikado Jl . Menteng ). 2(2), 73–81.

Hobbs, F.D, 1995, Perencanaan dan Teknik Lalu Lintas, Penerbit Gadjah Mada University Press.

Irawan, B. B., Yossyafra, & Momon. (2021). Analisis Kebutuhan Ruang Parkir Pengembangan Rumah Sakit Achmad Mochtar Bukittinggi. Construction and Material, 3(3).

Kemenhub. (1996). Pedoman Teknis Penyelenggaraan Fasilitas Parkir. In Departemen Perhubungan Direktur Jenderal Perhubungan Darat. Departemen Perhubungan Direktur Jenderal Perhubungan Darat.

Rarung, V. A., Pandey, S. V., & Kumaat, M. M. (2023). Analisis Pengaruh Hambatan Samping Terhadap Kinerja Ruas Jalan Trans Sulawesi di Kelurahan Buyungon Kecamatan Amurang. 21(85), 1164–1172. https://ejournal.unsrat.ac.id/v3/index.php/tekno

Saputra, J., Trisnawati, L., & Teknologi, I. (2024). Analisis Ruang Parkir Pada Objek Wisata Inhu Park Kecamatan Rengat Barat Kabupaten Indragiri Hulu Provinsi Riau. INNOVATIVE: Journal Of Social Science Research Volume, 4(1), 9933–9945.

Wahyudin. (2020). Analisis kebutuhan lahan parkir universitas muhammadiyah sukabumi. Jurnal Student Teknik Sipil, 2(1), 40–47.

Downloads

Published

2024-04-30

How to Cite

Sumajouw, J. ., Kabo, D. ., & Nicolaas, S. . (2024). Analysis of Parking Needs at Sakura Mart Amurang. Formosa Journal of Sustainable Research, 3(4), 691–706. https://doi.org/10.55927/fjsr.v3i4.8880

Issue

Section

Articles