Alleged Violation of Article 22 of Law Number 5 of 1999 Regarding the Procurement of Road Construction Work Packages (Acceleration Program) Package 3 (Pelangan-Sp. Pengantap 3) and Package 4 (Pelangan-Sp. Pengantap 4) at the Public Works and Spatial Planning Service Working Unit West Nusa Tenggara Province APBD Fiscal Year 2017-2018 Decision: 35/KPPU-I/2020
DOI:
https://doi.org/10.55927/fjsr.v3i5.9113Keywords:
Tender Conspiracy, Article 22 of Law no. 5 of 1999, Procurement of Goods and Services, Road Construction, NTB, Acceleration ProgramAbstract
This research analyzes alleged violations of Article 22 of Law no. 5 of 1999 regarding the practice of rigging tenders in the procurement of Packages 3 and 4 for road construction in NTB in 2017-2018. The analysis was carried out based on KPPU decision Number 35/KPPU-I/2020 and various other sources of information. The results of the analysis show that there are strong indications of violations of Article 22 of Law no. 5 of 1999, with horizontal and vertical conspiracy modes
Downloads
References
Abdillah, A. W. (2020). Evaluasi Penjadwalan Proyek dalam Efisiensi Waktu dan Biaya (Studi Kasus Proyek Rehabilitasi Saluran Drainase dan Boezem di Jalan Cumpat Kulon Baru I RT 4 Surabaya) (Doctoral dissertation, Universitas 17 Agustus 1945 Surabaya).
Alau, W., Bangun, S., & Sembiring, K. (2024). Analisis Faktor-Faktor Pekerjaan Proyek Prasarana Jalan Lingkungan Kelurahaan Sukma Jaya Kecematan Sukma Jaya Kota Depok. Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil, 2(2), 38-54.
Khabibulloh, M., & Adi, T. J. W. (2022). Optimasi Waktu dan Biaya (Time Cost Trade Off-TCTO) Menggunakan Particle Swarm Optimization (PSO). Jurnal Teknik ITS, 11(3), D146-D153.
Malaiholo, D., Kurniawan, M. A., & Anggraini, N. (2022). Analisa Pengendalian Biaya Dan Waktu Pada Pelaksanaan Proyek (Studi Kasus: Jalur Ganda Kereta Api Mojokerto-Jombang). Jurnal Talenta Sipil, 5(1), 49-54.
Muh Rajedi Banu, R. U. S. M. A. N. (2023). Kajian Persekongkolan Tender Pengadaan Barang Dan Jasa Pemerintah (Studi Kasus Putusan Nomor 35 Kppu-I Tahun 2020) Tentang Pelanggaran Pasal 22 Undang Undang Nomor 5 Tahun 1999 (Doctoral dissertation, Universitas Mataram).
Nuska, I. (2023). Peranan Unit Kerja Pengadaan Barang Jasa (UKPBJ) Kota Pekalongan Dalam Percepatan Pembangunan dan Pelayanan Masyarakat (Master's thesis, Universitas Islam Sultan Agung (Indonesia)).
Pangalila, D. S. P., Naukoko, A. T., & Tolosang, K. D. (2023). Analisis Penggunaan Dana Desa Sebelum dan Selama Pandemi Covid-19 Tahun 2017-2022 (Studi di Desa Lotta Kecamatan Pineleng Kabupaten Minahasa). Jurnal Berkala Ilmiah Efisiensi, 23(10), 85-96.
PATRIA, S. P. Program Hibah Jalan Daerah (Phjd) Dan Keterlibatan Perempuan Dalam Pekerjaan Konstruksi Jalan.
Pradhana, R. (2022). Analisis Risiko Teknis Pada Proyek Pembangunan Jalan Tol Solo–Yogyakarta–Nyia Kulon Progo Seksi I Paket 1.1: Solo–Klaten Sta 0+ 000–22+ 300.
Putra, G. D. (2022). Analisis Percepatan Durasi Proyek Dengan Penambahan Jam Lembur Dan Shift Kerja (Studi Kasus: Proyek Pembangunan Jalan Kawasan Industri Terpadu (Kit) Batang, Jawa Tengah).
Ridwan, A. (2020). Analisis Percepatan Proyek Menggunakan Metode Crashing Dengan Penambahan Jam Kerja Empat Jam dan Sistem Shift Kerja (Studi Kasus: Proyek Pembangunan Gedung RSUB Malang). Jurnal Aplikasi Pelayaran dan Kepelabuhanan, 11(1), 35-53.
Wahyuni, N., Bachmid, S., & Supardi, S. (2022). Pengaruh Kebijakan Protokoler Covid-19 terhadap Manajemen Waktu Pelaksanaan Proyek: Studi Kasus Program Hibah Jalan Daerah Di Kabupaten Tanah Toraja Dan Toraja Utara. Jurnal Konstruksi: Teknik, Infrastruktur dan Sains, 1(8), 31-42.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Agustinus Manurung, Ryan Faisal, Aep Hendar Cahyad

This work is licensed under a Creative Commons Attribution 4.0 International License.