Performance Analysis of the 2 MW Diesel Engine Generator as an Additional Power Plant at PT. Indolakto Purwosari
DOI:
https://doi.org/10.55927/ijar.v3i7.10333Keywords:
Diesel Engine Generator, Performance, Blackout, Prevention, PT IndolaktoAbstract
Fluctuations in electricity demand can lead to inefficiencies in diesel generators (DEG) and potentially trigger blackouts, as experienced by PT Indolakto. This study aims to identify the performance parameters of a 2 MW DEG and formulate strategies to prevent blackouts caused by the 2 MW DEG at PT Indolakto. The research used data collection techniques including field observations, interviews, literature studies, and performance test analysis. The results showed that the efficiency of the 2 MW DEG at load reached 44%, indicating there is still reserve power. An overload of 21% from the generator's capacity resulted in a blackout and a system frequency drop of 13.4 Hz from the normal frequency. Although the 2 MW DEG has adequate efficiency, optimization is necessary to prevent blackouts. One strategy is to use the 2 MW DEG as a system reserve for critical loads.
Downloads
References
Das, J. C. (2010). Transient in Electrical System, Analysis, Recognition, and Mitigation. McGraw-Hill, Inc.
Hatziargyriou, N., Milanovic, J., Rahmann, C., Ajjarapu, V., Canizares, C., Erlich, I., Hill, D., Hiskens, I., Kamwa, I., Pal, B., Pourbeik, P., Sanchez-Gasca, J., Stankovic, A., Van Cutsem, T., Vittal, V., & Vournas, C. (2021). Definition and Classification of Power System Stability - Revisited & Extended. IEEE Transactions on Power Systems, 36(4), 3271–3281. https://doi.org/10.1109/TPWRS.2020.3041774
IEEE/CIGRE. (2004). Definition and Classification of Power System Stability. IEEE Transactions on Power Systems, 19(2).
Matarry, A. A., & Sanda, F. (2022). Analisa Performa Efisiensi Mesin Diesel Dengan Eksperimen Variasi Pembebanan Daya Di PT PLN UPTD MG Nunukan. ELEMENTER: Jurnal Politeknik Caltex Riau, 8(2), 154–161. https://download.garuda.kemdikbud.go.id/article.php?article=3058770&val=11166&title=Analisa Performa Mesin Diesel Dengan Variasi Pembebanan Di PT PLN UPLTD MG Nunukan
Rizkal, A., & Sudarmanta, B. (2017). Karakterisasi Unjuk Kerja Diesel Engine Generator Set Sistem Dual Fuel Solar-Syngas Hasil Gasifikasi Briket Municipal Solid Waste (MSW) Secara Langsung. Jurnal Teknik ITS, 5(2). https://doi.org/10.12962/j23373539.v5i2.20017
Saiful Anwar, R. (2017). Analisis Stabilitas Transien dan Mekanisme Pelepasan Beban Akibat Penambahan Pembangkit 1 x 26,8 MW pada Sistem Kelistrikan PT. Petrokimia Gresik. Institut Teknologi Sepuluh Nopember.
Saputra, Z., Hasdiansah, H., Vanessa, M. C., Hairullah, H., & Andhika, D. R. (2023). Uji Performa Generator AC 3 phase untuk Pembangkit Listrik Tenaga Piko Hidro Skala Laboratorium. RESISTOR (Elektronika Kendali Telekomunikasi Tenaga Listrik Komputer), 6(1), 79. https://doi.org/10.24853/resistor.6.1.79-84
Stevenson, W.D., J., & Genger, J. J. (1994). Elements of Power System Analysis, 4 th Edition. McGraw-Hill, Inc.
Yanuar Astono, G., Lomi, A., & Suyono, H. (2020). Analisis Transient Stability Gangguan Short Circuit 3 Phase dan Generator Trip Pada Sub Sistem Paiton dan Grati. Jurnal EECIS, 14(3).
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Bian Irianti, Aulidina Dwi Nur Andriyanti

This work is licensed under a Creative Commons Attribution 4.0 International License.