Comparative Analysis of Construction Costs for Conventional and Precast Concrete in the Construction of a Laboratory Building at the State Islamic University of Tulung Agung, East Java
DOI:
https://doi.org/10.55927/ijar.v4i7.15084Keywords:
Conventional Concrete, Precast Concrete, Cost Efficiency, Time Efficiency, Construction MethodAbstract
This study aims to quantitatively compare the cost and time efficiency between conventional concrete and precast concrete construction methods in the construction of the UIN Tulungagung Laboratory Building. The main focus of this study is to identify the most optimal method in the context of project implementation efficiency for medium-rise buildings in non-metropolitan areas. Scientifically, this study contributes to enriching the literature on the selection of construction methods based on location and project characteristics. Practically, the results of this study are expected to serve as a strategic reference for contractors, project planners, and other stakeholders in determining efficient construction methods that are appropriate for resource constraints, including budget, time, and equipment availability.
Downloads
References
Abd El Fattah, A. M., Elfarra, A., Ahmed, W., Assaf, S., & Al-Ofi, K. (2023). Assessing the Factors Affecting the Use of the Precast Concrete Systems in Saudi Arabia Based on Stakeholders Survey. Arabian Journal for Science and Engineering,48 (4), 5467–5479.
Agrawal, A., Sanghai, S. S., & Dabhekar, K. (2021). Comparative Studies between Precast and Conventional Cast-In-Situ Structural Systems. IOP Conference Series: Materials Science and Engineering,1197 (1), 012062.
Chen, M. L. (2024). Revolutionizing construction: the efficiency of precast concrete installation. International Journal of Engineering Science and Applied Mathematics,15 (1), 1–9.
Li, C., Yang, Y., Su, J., Meng, H., Pan, L., & Zhao, S. (2021). Experimental research on interfacial bonding strength between vertical cast-in-situ joint and precast concrete walls. Crystals,11 (5).
USING CAST-IN-PLACE AND PRECAST METHODS Fitri Awaliah, B., & Nurasiyah, S. (2021). Analysis of Construction Time and Cost Comparison. E I N F O. Journal of Civil Engineering, 19(2), 99–108.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Bobby Mahendra, Qalya Fadhilah, Saihul Anwar

This work is licensed under a Creative Commons Attribution 4.0 International License.





























