Abstract

This study examines the influence of craftsmen's experience on construction project productivity in Cirebon. Using a productivity rating method based on perception, productivity was quantitatively measured through foreman observations. The results indicate that craftsmen's experience has a significant influence, contributing 40.4% to productivity. A strong positive correlation (ρ = 0.557) was also found between experience and work quality, indicating that more experienced workers tend to be more productive and efficient. The implications of this study emphasize that workers' experience is a key factor in achieving optimal productivity. Additionally, work quality, safety, and discipline are essential elements that must be considered to enhance project success.

Downloads

Download data is not yet available.

References

Al-Farisi, A. (2023). Study on the Application of Construction Management in the Controlling Phase of the Bone Regency Road Construction Project (Arung Palakka Airport Access Road, Awangpone District). Universitas Fajar.

Belferik, R., Andiyan, A., Zulkarnain, I., Munizu, M., Samosir, J. M., Afriyadi, H., Rusmiatmoko, D., Adhicandra, I., Syamil, A., & Ichsan, M. (2023).

Project Management: Theory & Application. PT. Sonpedia Publishing Indonesia

Bora, P. N. (2021). ANALYSIS OF WORKER PRODUCTIVITY IN THE IMPLEMENTATION OF ROAD REHABILITATION AND CONSTRUCTION PROJECTS SIANGAN-LOKASRANA. Mahasaraswati University Denpasar.

Faradina, M. P. (2021). Analysis of Labor Productivity in Reinforcement and Formwork Work at MTSN 3 Pekanbaru City. Riau Islamic University.

Faustine, C., & Waty, M. (2022). Ranking of Factors Affecting Labor Productivity in Construction Projects. JMTS: Journal of Civil Engineering Partners, 681–692.

Harris, S., Alam, B. P., & Wibowo, A. N. (2017). The Effect of Work Productivity

on the Delay in the Implementation of Building Construction Projects. C043– C052. Https://Doi. Org/10.32315/Ti, 6, c043.

Harun, M. (2013). Analysis of labor productivity in building construction work. Mitsu Scientific Journal (Civil Engineering Information Media of Wiraraja University), 1(2).

MAHARTIAN, A. F. (2021). Analysis of the Interaction between Workload and the Ideal Number of Operators Based on Work Movement Processes in Achieving Productivity Targets (Case Study: Final Regulation Assy Piano Gp Section, Assy Gp Department, Yamaha Indonesia).

Pandji, P., & Haryono, T. (2000). The Effect of Age on Labor Productivity in Bricklaying (Case Study on the Construction Project of Ahmad Dahlan University Campus in Yogyakarta).

Pattiraja, A. H., Gai, A. M., Pontan, I. D., Se, M. T., Mm, I. P. M., Eng, A., & Sahrullah, S. T. (2024). Civil engineering project management: strategies and tactics for construction projects: a reference book. PT. Media Penerbit Indonesia.

Pratama, B. R. (2024). The Influence of Work Motivation, Quality of Work Life, and Job Satisfaction on the Performance of Teachers at State Senior High School 2 Batu City. Maulana Malik Ibrahim State Islamic University.

Sitorus, M., Nizar, K., & Dewi, S. (2023). The Effect of Training and Implementation of Occupational Safety and Health (OSH) Systems on Employee Productivity at PT. Dwitunggal Jayalestari Medan. Journal of Economics, Accounting and Management Nusantara, 2(1), 29–35.

Sugiharto, E. T. (2006). Analysis of the Influence of Work Experience, Regional Origin, and Educational Level on the Productivity of Bricklayers (Case Study of the Housing Project at PT Wirotomo Persada SIeman).

Sugiyono, D. (2013). Research methods in education: quantitative, qualitative, and R&D approaches.

Sujana, C. M., & Hakim, R. A. (2021). Comparison of Labor Productivity in Reinforcement and Formwork During Normal Working Hours and Overtime Using the Productivity Rating Method. Journal of Civil Engineering Construction (JRKMS), 4(2), 145–152.

Thoengsal, J., & Mediatama, I. (n.d.). PRODUCTIVITY OF CONSTRUCTION PROJECT RESOURCES.

Wibowo, A. (2022). Budgeting. Prima Agus Teknik Foundation Publisher, 1–298.

Published

2025-08-27

How to Cite

Fauzan, R., Rachman, M. H. S., Pratama, H. A., & Kusumastuti, I. H. (2025). The Influence of Craftsmen’s Experience on Construction Project Productivity in the Cirebon Region. Indonesian Journal of Advanced Research, 4(8), 1877–1896. https://doi.org/10.55927/ijar.v4i8.15163