Risk Analysis on the Construction of the Serpong – Balaraja Toll Road Section 1A (KPBU Proyek)
DOI:
https://doi.org/10.55927/ijar.v2i5.4538Keywords:
Risk Analysis, Toll Road, Serpong - Balaraja, Validation, Correlation Test ReliabilityAbstract
Indonesia has carried out a lot of infrastructure development, especially toll road infrastructure. To meet the needs of the public PT. Trans Bumi Serbaraja built the Serpong - Balaraja toll road. During the implementation of the development process, several risks were found that had an impact on the implementation of toll road construction. This study has the aim of analyzing, knowing the dominant risks, and countermeasures to anticipate dominant risks in the construction of the Serpong - Balaraja toll road section 1 A (KPBU Project). The results of the study show six aspects, namely: (1) nature and environment, (2) economy and finance/finance, (3) safety, (4) technical, (5) logistics/materials, (6) politics and regulations. Correlation test results of 34 variables, 11 variables are very strong, 21 variables are strong, and 2 variables are moderate. Dominant risk in variable research related to society.
Downloads
References
Darmanto, Eko, Latifah, Noor, & Susanti, Nanik. 2014. “Penerapan metode
AHP (Analythic Hierarchy Process) untuk menentukan kualitas gula tumbu”. Simetris: Jurnal Teknik Mesin, Elektro Dan Ilmu Komputer, 5(1), 75–82
Faisal, Muhammad dan Andi Tenrisukki Tenriajeng. 2021. “Analisis Risiko
Pada Tahap Pelaksanaan Konstruksi Jalan Tol Cinere-Jagorawi, Depok”. Jurnal Kacapuri, 4 (2): 223-234.
Fakhri, Muhammad. 2019. “Analisis Potensi Dan Risiko Pembiayaan
Infrastruktur Jalan Tol Berbasis Syariah Di Indonesia”. Jurnal Sains dan Teknologi, 11 (1): 70-78.
Munggarani, Nurrela dan Paramitha Zubair. 2017. “Analisis Faktor-Faktor yang
Berdampak Pada Risiko Dan Ketidakpastian Permintaan Jalan Tol Di Indonesia”. Jurnal Teknik Mesin Mercu Buana, 6 (2): 137-146.
Nurdiana, Asri dan Bambang Setiabudi. 2018. “Aplikasi Manajemen Risiko
Pada Proyek Jalan Tol Semarang-Solo Ruas Bawen-Solo”. Jurnal Potensi, 1 (1): 21-28.
Nurhayati, Erna, Ersa Tri Wahyuni dan Evita Puspitasari. 2021. “Risiko
Infrastruktur Jalan Tol dengan Skema Public-Private-Partnership (PPP) di ASEAN: Suatu Tinjauan Literatur”. Jurnal Manajemen Aset Infrastruktur & Fasilitas, 5 (1): 43-60.
Purwana, Dendi dan Fitri Suryani. 2020. “Pengelolaan Risiko Pembangunan
Jalan Tol Serpong-Cinere. Construction Endineering and Sustainable Development, 3 (2): 80-85.
Rahmawati, Nia dan Andi Tenrisukki Tenriajeng. 2020. “Analisis Manajemen
Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi-Cawang-Kampung Melayu). Rekayasa Sipil, 14 (1): 18-25.
Samosir, Herri Suryadi, A. Perwira Mulia Tarigan dan Fahmi. 2021.
“Pemanfaatan Metode AHP Dalam Pemilihan Proyek Infrastruktur”. Garuda, 6 (5): 2217-2234.
Santoso (2017). Analisis Manajemen Risiko Pada Proyek Pembangunan Jalan
Tol Ngawi-Kertosono. Jurnal Teknik Sipil Universitas Muhammadiayah Surakarta.
Setiawan, Andi, Eko Walujodjati dan Ida Farida. 2014. “Analisis Manajemen
Risiko Pada Proyek Pembangunan Jalan Tol Cisumdawu (Studi Kasus: Development of Cileumyi-Sumedang Dawuan Toll Road Phase I). Garuda, 11 (1): 1-11.
Wahyuni, Putu Ika, Putu Gede Suranata dan Putu Gde Erick Triswandana.
“Kajian Manajemen Risiko dalam Proyek Kerjasama Pemerintah Swasta (KPS)/ Kerjasama Pemerintah Badan Usaha (KPBU) dengan Menggunakan Metode House Of Risk (HOR)”. Konferensi Nasional Teknik Sipil Ke-13: 618-625. Banda Aceh, 19-21 September 2019: Jurusan Teknik Sipil Fakultas Teknik, Universitas Syiah Kuala.
Yetrina, Mutiara. 2018. “Pengembangan Algoritma Manajemen Risiko Proyek
Konstruksi”. Jurnal Optimasi Sistem Industri, 17 (1): 101-1
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Rocky

This work is licensed under a Creative Commons Attribution 4.0 International License.




























