Legal Analysis of Contract Change Orders (CCO) Affecting Addendums in Construction Contracts
DOI:
https://doi.org/10.55927/jlca.v4i1.13573Keywords:
Contract Change Order, Addendum, Subcontract, Construction Law, Project ManagementAbstract
This study examines the influence of Contract Change Order (CCO) on addendum in a contract, focusing on the legal aspects and practical implications in the implementation of construction projects. CCO is an important instrument that allows changes in the scope, cost, and time of a project, which can lead to the issuance of an addendum. Through a juridical-normative approach and case study analysis of the Diponegoro Street Widening and Overlay project in Sragen, this study found that CCO has significant legal power in influencing addendum. The results show that CCO not only affects the cost and time of implementation but also the quality of the final project results. The addendum process is crucial to ensure that all changes are officially recorded, as well as to maintain compliance with applicable regulations. This study concludes that effective change management through CCO and addendum is key to achieving construction project success.
Downloads
References
Admin Sipil Uma, ''Dasar Hukum dan Pengertian Contract Change Ordere (CCO)'', https://search.app/D2YjngPQiT9T8wqA8, 13 Januari 2025 pukul 18.50 WIB
Afifah Sabrina, ''Kekuatan Mengikat Addendum Kontrak Pemborongan Dalam Perjanjian Dari Perspektif Syarat Sah Perjanjian'', (Makassar: Universitas Muslim Indonesia, 2022),
Ali murtopo, et.al , ''Kajian Contract Change Order (CCO) Pada Proyek Pembangunan Laboratorium Terpadu Universitas Tidar'', Journal Rice, 2022,
Anisha Wahyuningtias, ''Sahkan Perjanjian yang Ditandatangani Satu Pihak Saja'', (https://search.app/vHW3KpgUdJCvcpRb7 , 15 Januari 2024, 2024)
Anom, I. Gusti Ngurah. "Addendum Kontrak Pemborongan Perspektif Hukum Perjanjian Di Indonesia." Jurnal Advokasi 5.2 (2015): 29393.
Denaya Annisa, et.al, ''Pentingnya Sebuah Addendum Dalam Keberlangsungan Suatu Proyek Pembangunan'', 2021
Dian Perwitasari, et.al. ''Identifikasi Dampak Contract Change Order Terhadap Biaya dan Kualitas Pada Proyek Gedung Laboratorium Teknik 2 Institut Teknologi Sumatera'', Itera,
Edison Hatoguan Manurung, et.al, HUKUM KONTRAK KONSTRUKSI, Batam, 2023
Fabian J. Manoppo, et.al, ''Analisis Penyebab dan Pengaruh Contact Change Order Terhadap Kinerja Kontraktor pada Proyek Konstruksi Di Kabupaten Minahasa Selatan'', Jurnal Ilmiah Media Engineering, Universitas Sam Ratulangi Manado, 2022, hlm.22
Halim, HUKUM KONTRAK, Sinar Grafika, Jakarta Timur, 2021
Kitab Undang - Undang Hukum Perdata Prof. R. Subekti, S.H. dan R. Tjitrosudibio
Larashati, Ni Putu Okky, Tjokorda Istri Praganingrum, and Ni Luh Made Ayu Mirayani Pradnyadari. "Analisis Monitoring Varian Waktu Pelaksanaan Proyek Setelah Terjadinya Contract Change Order Menggunakan Program Microsoft Project." Jurnal Ilmiah Teknik Universitas Mahasaraswati Denpasar (JITUMAS) 4.1 (2024)
M. Dhuhar Trinanda dan Khairani, ''Tanggung Jawab Penyedia jasa konstruksi terhadap kegagalan bangunan (suatu penelitian di Proyek Pembangunan Gudang Pengepakan Ika Lampulo Banda Aceh), Jurnal Ilmiah Mahasiwa Bidang Hukum Keperdataan, Vol. 2(2), 2018,
Octariyani, Skripsi: ''Tanggung Jawab Hukum Perjanjian Pekerjaan Konstruksi'' (Jakarta: UIN Syarif Hidatullah, 2019
Pangestu, Bayu Aji. Analisis Biaya Dan Waktu Contract Change Order (CCO) Proyek Gedung 5 Lantai Tahap IV (Rumah Sakit Jiwa Daerah Surakarta)-1950100005. Diss. Universitas Veteran Bangun Nusantara, 2023.
Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 07/PRT/M/2011 Tahun 2011 tentang Standar dan Pedoman Pengadaan Pekerjaan Konstruksi dan Jasa Konsultansi
Peraturan Presiden Nomor 16 Tahun 2018 tentang Pengadaan Barang/Jasa Pemerintah
Pujiati, "Metode Penelitian Yuridis Normatif di Bidang Hukum", https://penerbitdeepublish.com/metode-penelitian-yuridis
Renata Christha Auli, ''Asas-asas dalam Pasal 1338 KUHPerdata'', (https://search.app/MiDLA5jSu7GbzrHG6 , 15 Januari 2024, 2024)
Sajiah, Faslan Syam. "Keterkaitan antar Faktor Penyebab Pembengkakan Biaya pada Proyek Transportasi dengan Kontrak Tahun Jamak." JURNAL MANAJEMEN KEUANGAN PUBLIK 6.2 (2022): 64-84.
Selly Mardiana, ''Faktor Penyebab Terjadinya Contract Change Order (CCO) dan Pengaruhnya Terhadap Pelaksanaan Proyek Konstruksi Pembangunan Ruang ICU RSUD Pandan Arang Kabupaten Boyolali'', (Semarang: Univeristas Semarang, 2022),
Undang-undang (UU) Nomor 2 Tahun 2017 tentang Jasa KonstruksiPerpres no 54 tahun 2010
Wagino, ''Tinjauan terhadap Gugatan Perbuatan Melawan Hukum'', (https://www.djkn.kemenkeu.go.id/artikel/baca/14384/Tinjauan-terhadap-Gugatan-Perbuatan-Melawan-Hukum.html , 15 Januari 2024, 2024)
Yudhi Arnandha, et.al , ''Analisis Pengaruh Contract Change Order (CCO) pada Siklus Keberlangsungan Proyek'', Jurnal Profesi Insinyur Indonesia, 2023,
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Rosiana Agnes Rizky, Martono Anggusti, Jinner Sidauruk

This work is licensed under a Creative Commons Attribution 4.0 International License.