Analysis of Reinforcement Connections in Columns with the Coupler Method in terms of Cost, Quality and Project Time the Stature
DOI:
https://doi.org/10.55927/marcopolo.v1i3.3777Keywords:
Coupler Connection, Lap splice, Quality and TimeAbstract
In selecting the type of material and the method of carrying out installation work on structural steel joints in the world of construction, things that must be considered in terms of cost, quality and time, there are two alternatives in selecting the type of reinforcement connection in column work, namely: lap splice and coupler, lap splice connection is a method traditional way to connect the two reinforcement when the column erection is carried out. Mechanical connection or (Coupler) is the newest method to connect two reinforcement using a coupler. The mechanical connection or connection (Coupler) does not depend on the strength of the concrete in the column, so this connection is stronger than the lapsplice connection. Data collection was carried out using the direct observation method in the field, and calculations were made on the column reinforcement joints with a tensile test (Coupler) to obtain 59.28 kgf/mm2 or 578.92 mpa. This refers to SNI-07-2052-2017 because in SNI the minimum limit for the tensile strength of reinforcing steel is 525 MPa. The calculation results show that reinforcement for 7 columns D32 with the Coupler method takes an average of 4221 minutes, or 9 days, 19 minutes/floor, and requires a total cost of 5449.50 minutes or 11 hours using the Lapsplice/overlap method. , 35 minutes/floor.
Downloads
References
“Amar Mufhidin, Acep Hidayat, dan Syahroni Arifbudiman” Fakultas Teknik Marcu Buana “Analisis Tingkat Pengendalian Resiko Kerja Pada Proyek”.
“Analisa Penggunaan Besi Struktur dengan Metode Lap Splice dan Coupler Untuk Peningkatan Efisiensi”
Efisiensi Penggunaan Coupler Jenis Senai Pada Kolom Di Proyek The Statur
Jurnal Sain dan Teknologi Teknik Utama, Edisi Khusus, Mei 2019 “PENGARUH PENGUNAAN METODE SAMBUNGAN PEMBESIAN COUPLER TERHADAP RENCANA BIAYA PELAKSANAAN”
“Robert Denti Jurusan Teknik Mesin Universitas Sam Ratulang” Permodelan Pengujian Tarik Untuk Menganalisis Sifat Mekanik Mater
Permodelan Pengujian Tarik Untuk Menganalisis Sifat Mekanik Material” Robert Denti Salindeho, Jan Soukota, Rudi Poeng”
Materi Perencanaan Pengendalian Proyek “Proyek Kontruksi” (Sentosa 2008 & PMBOK Guide 2004).
Materi “ Kerja Praktek” Activity On Arrow” Univ. MPU Tantular.
SNI 07-2052-2017 tentang Standar Baja Tulangan Beton.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Achmad Murtadho, Kasimir Sawito, Abdul Mubarok, Edison Hatoguan Manurung, Sarjono Puro

This work is licensed under a Creative Commons Attribution 4.0 International License.









